Connect machines and results
Display machined samples, measurements or process diagrams alongside the relevant equipment.
Vietnam B2B trade-fair guide / Precision engineering & manufacturing
Machine tools, metrology and manufacturing technology in Ho Chi Minh City. Let production teams inspect the equipment, assess sample quality and discuss the process in detail.
Exhibitor planning angle
Build the plan around machine dimensions, weights and the demonstration sequence. Confirm the actual hall, service positions and organiser approvals before fabrication.
This independent guide is for exhibition planning. Zeno is not the event organiser and does not sell admission or exhibition space.
What to resolve early
Display machined samples, measurements or process diagrams alongside the relevant equipment.
Allow engineers to view working areas and ask detailed questions without interrupting the demonstration.
Confirm power, loading, rigging and operational requirements with the organiser using the current manual.
Work backwards from the permitted installation window and allow time for agreed checks.
From allocation to handover
Collect the latest exhibitor manual, floor plan, stand number, submission dates, service forms and move-in programme from the organiser.
Agree the audience, products, desired visitor action, demonstrations, meeting needs, storage, budget range and internal approval path.
Develop the approved booth direction against the allocated footprint and coordinate the information included in the agreed submission and production scope.
Build the contracted scope, coordinate installation within the confirmed programme and complete the agreed checks before the exhibitor team takes over.
Exhibiting at SECC?
Send the official manual, floor plan, stand number, budget range and internal approval date. Zeno can then scope the booth work against the actual event conditions.
Plan your exhibition booth↗